Accomplished this week:
B1
· Finished our level
· Tested our level and fixed glitches
· Worked on final report and our portion of the game manual.
B2
· Finished the programming for the game
· Applied level specific sprites
· Finished created objects
B3
· Finished game part, but it might need a bit more touching up
· Did our part of the user manual
B4
· Finished End Game interface
· Assigned jobs for instruction manual
· Assigned parts for final report
B5
· Finished our portion of the video game
· Created a room for the interface between our level and the next groups
· Began testing the video game
· Distributed work loads for user manual and final report
B6
· Completed programming of all areas
· Tested for bugs
· Submitted program to be compiled
Monitoring and Control:
To be accomplished next week:
B1
· Prepare for presentations
· finish final report
B2
· Prepare for Monday’s presentation
· Finish and compile manual
B3
· Do final report
B4
· Finish final report
· Finish instruction manual
· Compiling instruction manual
B5
· Prepare the prototype presentation, then present on Monday
· Do our section of the user manual
· Do our section of the final report
B6
· Final testing of program
· Work on supporting documents
· Prepare for presentation
Additional Information
Each group completed their level for our game. Although a couple groups were a day or two late we got the video game together and compiled on schedule. Each group should have tested their individual levels before sending it to be compiled, so all that’s left to test is the interfaces between each level. Next week each group’s project management representative is expected to do thorough testing of the complete game by playing it. Also, as a lab we have to complete the entire and poster and user manual next week. The design prototype presentation is next week, so on the weekend we will be preparing a presentation for Monday.